+1 954 767 8305       Email Us
Click arrows for more images

V78 Princess

Make: Princess
Model: V78
Boat Name: CHANGE ORDER
Year: 2010
Price: $ 1,395,000
IYBA ID: 2764694
Length: 78 ft
Location: Fort Lauderdale Florida United States


 
 

CHANGE ORDER is a stunning example of the V78 Princess. Her impressive 4 stateroom layout plus crew quarters provides an abundant amount of space. This vessel’s impressive upgrades set her apart from the rest. In 2015, the current owner installed wireless yacht controller allowing joystick style, dual hydraulic bow and stern thrusters, new audio/visual systems ($50,000), and all new exterior soft goods with premium leather on the interior helm seats. Topping out at 37 knots, she is sleek and fast with a custom dark blue hull sides, painted in December 2017. 

MANUFACTURER WALKTHROUGH

Powerful, sleek and contemporary, the Princess V78 is built to excite the emotions and indulge the senses.

Engineered using the latest infusion technology to reduce weight and improve fuel efficiency, she delivers an outstanding performance and is one of the most dynamically capable craft of her class.

Whether relaxing or socializing, the spacious cockpit provides the perfect space for both with generous seating, a highly equipped wet bar and a large sunbed. The tender garage is large enough for a 4m jet-RIB and this together with the hydraulic platform make watersports a real joy. For a quieter escape, the foredeck features a walk-through coachroof providing additional seating for a secluded aperitif.

Sliding glass doors and a powered drop window open up the incredibly light saloon to the cockpit to create one expansive entertaining space which is further enhanced by the contemporary styled furniture and impeccable choice of fine fabrics and finishes. The forward dining area seats eight comfortably and is situated below the wide sliding sunroof, it also shares the exceptional views and sightlines of the helm, so creating a true open boating sensation.

The stylish lower accommodation is finished to the highest of standards and features a highly equipped galley and four beautiful en-suite cabins. The substantial master stateroom sits amidships and enjoys wonderful views from large windows either side. The guest cabins include a spacious double with en-suite bathroom and two further twin cabins to port and starboard. A three cabin layout can be specified replacing the starboard cabin with a lower saloon which furnished with a huge LCD TV makes the perfect hide-out.

STANDARD EQUIPMENT

  • Power-assisted electro-hydraulic steering system
  • Hydraulic bow thruster 
  • 24v DC/240v AC electrical system
  • 240v shore power with two (2) 80-amp float battery chargers
  • 220v/240v diesel generator (22.5 kw) (3000 hours)
  • Full air conditioning
  • Remote control electric anchor winch
  • Electro-hydraulic trim tabs with indicators
  • Autopilot
  • VHF with DSC R/T
  • Two (2) Furuno Navnet 3D radars with scanner and GPS/chart plotter (twin displays)
  • Speed and distance log
  • Remote control searchlight
  • Combination microwave/conventional oven/grill
  • Refrigerator (full height with deep freeze)
  • Icemaker 
  • Dishwasher
  • Cockpit wet bar with sink, top loading coolbox and electric barbecue
  • Vacuuflush toilets with holding tank
  • Salon LCD TV/DVD with surround-sound system
  • Teak-laid transom platform/cockpit deck/steps to side decks
  • Cockpit sunbed and cushions
  • Double opening stainless steel framed saloon door with drop window
  • Hard top with electrically operated sliding sunroof
  • Electro-hydraulically opening garage with storage for tender or wet bike
  • Transom door
  • Transom platform with electro-hydraulic raise/lower mechanism
  • Hot and cold transom shower
  • Tonneau cover

EXTERIOR AND DECK

  • Hull sides painted December 2017
  • New teak deck installed February 2018
  • Lewmar reversible electric anchor winch with foredeck and helm position controls
  • Two (2) Lewmar 24V electric stern winches
  • Self-stowing 50kg/110lb Delta anchor with 100m chain
  • Two (2) bow rope and storage lockers
  • Anchor fresh water wash down
  • Stem head roller with automatic anchor launch and retrieve
  • Eight (8) stainless-steel bow, stern and spring cleats
  • Stainless-steel pulpit and guard rails
  • Two electric stern line winches
  • Stainless-steel coach roof handrails
  • Twin coach roof lockers for storage of fenders, ropes and sunbed cushions
  • Foredeck hatch to VIP cabin
  • PVC rubbing band with stainless-steel insert
  • IMCO navigation lights
  • Running lights
  • Searchlight with remote control
  • Twin electric horns
  • Fuel and water fillers
  • Electro-hydraulic telescopic passarelle (4.4m) with remote control
  • Stern docking lights
  • Foredeck sunbed with electrically adjustable headboard with new cushions (New 2015)
  • Williams Turbojet 445 tender

HELM AND ELECTRONICS

  • Twin helm seats with electric adjustment
  • Electronic CAT engine controls and digital displays
  • Bennett trim tabs
  • Furuno GPS
  • Furuno radar
  • Furuno  navpilot
  • Two (2) Furuno 12” Navnet 3D displays
  • Furuno speed log
  • Furuno Echo sounder with alarm
  • Simrad RS87 VHF radio
  • Red night lighting
  • White overhead light
  • Oceanview night vision camera
  • Furuno AIS system display
  • Princess leather wrapped steering wheel
  • AC/DC control systems panel
  • Door to side deck
  • Toughened glass windscreen clear for unimpaired night vision
  • VDO Instrument panel
  • Full engine instrumentation
  • Fuel gauges
  • Electronic engine and gear shift controls
  • Power-assisted electronic steering with hydraulic back up
  • Bow thruster controls
  • Rudder position indicator
  • Electro-hydraulic trim tab controls with indicators
  • Color radar with scanner and GPS/chartplotter (twin displays)
  • Flastimo high-speed compass
  • Anchor winch remote control
  • Searchlight remote control
  • Chart area
  • Three (3) windscreen wipers with freshwater wash
  • Three (3) bilge pump controls with visual "pump running" indicators
  • Fuel contamination alarm system
  • Air-conditioning outlets
  • 12v outlet

ELECTRICAL

  • Upgraded 27kw 24 volt Onan Generator (3000 hrs)
  • Four (4) heavy duty batteries for engine starting
  • Six (6) heavy duty auxiliary batteries
  • Engine alternators charge both banks of batteries via automatic switch charging system
  • Two (2) 80amp battery chargers charge both banks of batteries via an automatic switch charging system
  • Battery paralleling system with remote control at helm position
  • Remote battery master switches with control switch at main panel
  • Circuit breakers on all circuits
  • 24-12v dropper for certain navigation and radio circuits (220/240 volt)
  • Shore support inlets
  • Generator/shore support change-over system
  • Power points in salon, galley (double), owner’s stateroom, guest and crew cabins

COCKPIT

  • Teak decking
  • U-shaped seating/dining area with folding table and additional L-shaped seat with coffee table
  • Cockpit wet bar with sink, top loading coolbox, electric barbecue, waste bin and stowage
  • Sunbed aft
  • Storage garage for dinghy/jet ski and general stowage with electro-hydraulic aft door and electric winch system for dinghy/jet ski retrieval
  • Life raft storage (for 2 x 8 man)
  • Access door to crew cabin
  • 220/240v shore support inlet
  • Stowage lockers
  • Stainless-steel grab rails
  • Cockpit lighting
  • Cockpit speakers linked to saloon surround sound system
  • Twin cockpit gates leading to aft deck and to bathing platform with raise/lower facility (400kg capacity)
  • Hot and cold transom shower
  • Foldaway swimming ladder

SALON

  • U-shaped Ostrich sofa with high gloss walnut coffee table to starboard
  • Port sofa with hidden 42” Samsung flat screen TV (Intellian HD Satellite - new in 2015)
  • Bar unit incorporating refrigerator, bottle and glass storage
  • Entertainment center incorporating LED TV/ DVD/ Radio/ MP3 with powered lift linked to Bose surround sound system - (New in 2015)
  • L-shaped dinette
  • All windows in toughened safety glass
  • Electric opening window port side to starboard and aft
  • Blinds, curtains or sunscreens to all windows and doors
  • Overhead down lighters and concealed lighting
  • Electrically operated opening sunroof
  • Double opening stainless-steel framed salon door with drop window
  • Cruisair A/C with digital control
  • Wenge wood sole with white carpet
  • LED Lighting throughout

GALLEY

  • Granite countertops
  • Shott Four-zone ceramic hob with exhaust hood and light
  • Combination Panasonic microwave/conventional oven with grill
  • Vitrifrigo icemaker
  • Miele dishwasher
  • Stainless-steel sinks with Delta mixer taps
  • Vitrigrigo full-height fridge/freezer
  • Storage cupboards, drawers and lockers
  • Waste bin
  • Combination Miele washer/dryer and storage in companionway
  • Cruisair air conditioning
  • Plentiful drawer cabinet storage

MASTER STATEROOM

  • Large king-size bed
  • Vanity with chair and multiple storage drawers
  • Walk-in closet
  • Built-in safe
  • Chaise lounge
  • Drawers and storage lockers
  • Overhead and individual berth lights
  • LED TV with surround sound entertainment system

MASTER HEAD

  • Twin sink with Samuel Heath mixer taps
  • Separate shower cubicle with automatic shower pump-out
  • Extractor fan
  • Mirror
  • Storage lockers
  • Large stall shower with Hansgrohe fixture and black galaxy granite floors
  • Dometic Vacuflush toilet

VIP GUEST STATEROOM

  • Large double bed
  • Vanity unit with storage
  • Wardrobe with shelves
  • Drawers, cupboards and storage lockers
  • LED TV
  • Overhead and individual berth lights
  • Deck hatch with fly screen and blind

VIP HEAD

  • Sink with Samuel Heath mixer tap
  • Separate shower cubicle with automatic shower pump-out
  • Extractor fan
  • Mirror
  • Storage lockers

PORT GUEST STATEROOM

  • Two full-size single berths
  • Wardrobe with shelf and hanging locker
  • Storage lockers
  • Downlighters and individual berth lights
  • 19” Samsung Flat screen TV
  • Kenwood CD/DVD/MP3 player

PORT GUEST HEAD

  • Ensuite head with stall shower
  • Sink with Samuel Heath mixer tap
  • Separate shower cubicle with automatic shower pump-out
  • Extractor fan
  • Mirror
  • Storage locker
  • Separate access from passageway as well as from cabin
  • Two (2) opening port lights
  • Venetian wood blinds

STARBOARD GUEST STATEROOM

  • Two single berths
  • Wardrobe
  • Storage locker
  • Downlighters and individual berth lights

CREW CABIN

  • Two full-size single berths, storage lockers and enclosed
  • Toilet, washbasin and separate shower compartment

BROKER'S REMARKS

CHANGE ORDER has been well maintained and her 1,825 hp Caterpillar C-32's allow for exceptional speeds and performance. Her owners plans have changed, and as such, CHANGE ORDER offers exceptional value as compared to other Princess V78s available globally.

DISCLAIMER

The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.


CONTACT US About This Yacht

+1 954 767 8305